As a result, the metro authority needed to evacuate the men and women, leading to substantial delays and sluggish progress in the development on the metro railway in that location.[167] The Mominpur metro station was planned to generally be developed across a 2500 sq. m region. Even so, the Ministry https://railwaykolkata90000.blogacep.com/37300923/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf