As viewed from the figure below, continuous auger is used to drill the borehole, raise up drilled soil, and pour concrete even though the auger is moved up. As a result, the borehole would not need casing or hydrostatic force to circumvent harm to the borehole wall. The construction process https://castinsitupiles81367.articlesblogger.com/55206742/5-tips-about-cast-in-situ-piles-you-can-use-today