Initially, the Jai Hind metro station was prepared for being elevated. Even so, the AAI objected the elevated stretch up to your airport may possibly pose a danger to aircraft, Therefore the route was additional reworked plus the station was shifted underground, 150 m within the Airport terminal constructing. If candidates https://louisrgqaf.blog2freedom.com/32257335/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf