Due to producing difficulties, shipping and delivery delays happened for many J 35D subsystems, causing that the two initial J 35D sequence getting sent with only aspects of the planned avionics mounted. Before it was decided to build the JAS 39 Gripen within the late 1970s, an intense study was https://kra3557777.bloginder.com/37184229/kra35-cc-fundamentals-explained