Project Summary At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the noteworthy conclusion of the project. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall energy usage and CO₂ emissions. https://sb-bookmarking.com/story20806339/high-efficiency-400-kw-chiller-installation-secures-fifty-thousand-pounds-yearly-energy-savings-and-200-tonnes-co%E2%82%82-saving